Manufacturing Voucher or Bill of Materials (BOM) in TallyPrime

“Manufacturing” is a broader concept that refers to the process of creating / producing goods through the transformation of raw materials or components into finished products.

Bill of Materials (BOM): Tally Prime allows you to create and manage Bill of Materials, which is a detailed list of all the components, raw materials, and sub-assemblies required to manufacture a finished product.

Cost Tracking: Manufacturing involves various costs such as raw materials, labor, overheads, and more. Tally Prime’s manufacturing features help in tracking and calculating these costs accurately, providing insights into the overall cost of production.

Manufacturing means converting raw materials into a finished product.  In TallyPrime, you can record the process of manufacturing using features like: 

  • Bill of Materials (BOM)
  • Manufacturing Journal
  • Stock Items & Units
  • Cost Tracking 

 

Why Use Manufacturing in TallyPrime? 

Using the manufacturing feature in TallyPrime helps you: 

Purpose  Benefit 
Track material usage  Know how many raw materials were used 
Record finished goods  Maintain correct stock of manufactured items 
Calculate actual cost of production  Include all direct costs in finished product 
Save time  Automated material consumption entries 

 

To make it efficient, TallyPrime uses a Bill of Materials (BOM), which is a predefined list of raw materials required to manufacture a finished product.

 

Step 1 Purchase Following Raw Material

GOT >> Vouchers >> Purchase

 

Step 2 Create A New Voucher
Gate Way Of Tally >> Create >>Voucher Type

  • Select type of voucher
  • Use as Manufacturing voucher journal

 

Step 3 Create Finishing Stock Item “Computer Assemble”

 

Set Up Components or Raw Materials Ratio Quantity

 

Step 4 Pass Manufacturing Voucher by Pressing ALT F7

 

Manufacturing Voucher will be like this

 

Example 1: Computer Assembling 

Party: TechSource Traders 

Raw Material Purchase: 

Item  Qty  Rate  Amount 
CPU  10  ₹20,000  ₹2,00,000 
Monitor  10  ₹10,000  ₹1,00,000 
Keyboard  10  ₹1,000  ₹10,000 
Mouse  10  ₹500  ₹5,000 

Total Purchase = ₹3,15,000 

Production: 

You assemble 5 Computer Sets using 5 of each component. 

Used Material  Qty Used 
CPU  5 
Monitor  5 
Keyboard  5 
Mouse  5 

Finished Product:
5 Computer Sets @ ₹63,000 each = ₹3,15,000 

 

Balance Stock: 

Item  Opening  Used  Balance 
CPU  10  5  5 
Monitor  10  5  5 
Keyboard  10  5  5 
Mouse  10  5  5 
Computer Set  0  —  5 

 

Example 2: Car Manufacturing 

Party: AutoZone Parts Ltd. 

Raw Material Purchase: 

Item  Qty  Rate  Amount 
Car Engine  5  ₹1,50,000  ₹7,50,000 
Car Body  5  ₹2,00,000  ₹10,00,000 
Tyre Set  5  ₹25,000  ₹1,25,000 
Paint Material  5  ₹5,000  ₹25,000 

Total Purchase = ₹19,00,000 

 

Production: 

Assemble 5 Cars 

Used Material  Qty Used 
Car Engine  5 
Car Body  5 
Tyre Set  5 
Paint Material  5 

Finished Product:
5 Cars @ ₹3,80,000 each = ₹19,00,000 

 

Balance Stock: 

Item  Opening  Used  Balance 
All Items  5  5  0 
Car  0  —  5 

 

Example 3: Cake Manufacturing in a Bakery 

Party: Fresh Bake Suppliers 

Raw Material Purchase: 

Item  Qty  Rate  Amount 
Flour  50 kg  ₹40  ₹2,000 
Sugar  20 kg  ₹45  ₹900 
Butter  10 kg  ₹200  ₹2,000 
Eggs  100  ₹10  ₹1,000 
Boxes  20  ₹20  ₹400 

Total Purchase = ₹6,300 

 

Production: 

Bake 20 Cakes 

Used Material  Qty Used 
Flour  20 kg 
Sugar  10 kg 
Butter  5 kg 
Eggs  40 
Boxes  20 

Finished Product:
20 Cakes @ ₹315 each = ₹6,300 

 

Balance Stock: 

Item  Opening  Used  Balance 
Flour  50 kg  20  30 kg 
Sugar  20 kg  10  10 kg 
Butter  10 kg  5  5 kg 
Eggs  100  40  60 
Boxes  20  20  0 
Cakes  0  —  20 

 

 

 

 

 